Klamath River Hydroelectric Project




not to be confused with the Klamath Project

The Klamath River Hydroelectric Project is a series of hydroelectric dams and other facilities on the mainstem of the Klamath River, in a watershed on both sides of the California/Oregon border.


The infrastructure was constructed between 1903 and 1962, the first elements engineered and built by the California Oregon Power Company ("Copco"). That company merged into Pacific Power and Light in 1961, and is now the energy company PacifiCorp. PacifiCorp continues to operate the project for profit, producing a maximum of 169 MW from seven generating stations. The company owns all but one of the dams.


As of 2016, four of the project's dams are scheduled for removal by the year 2020, pending approval by the governing Federal Energy Regulatory Commission. A fifth is running at reduced output, facing eventual decommissioning.[1]


The project should not be confused with the Klamath Project, a set of United States Bureau of Reclamation (USBR) dams on upstream tributaries of the Klamath, operated primarily for agricultural water storage. The Link River Dam belongs to both.




Contents






  • 1 Inventory


  • 2 Dam removal


  • 3 Link River Dam decommissioning


  • 4 References


  • 5 External links





Inventory





Link River Dam, May 1938


PacifiCorp owns all project dams, except for Link River Dam, which is owned by the U.S. Bureau of Reclamation. All dams are on the mainstem of the Klamath, except for Fall Creek Dam, on a tributary. The project's dams include:



  • the Fall Creek Dam, located north of Copco Dam #2 on a close tributary of the Klamath, built for hydropower generation by the Siskiyou Electric Power Company and operational by 1903

  • the Copco Dam #1 (completed 1912-16, expanded 1922) and #2 (completed 1922-1925), both for hydropower generation. Copco Dam #1 impounds Copco Lake

  • the Link River Dam, completed in 1921 primarily for flood control and water storage, with secondary hydropower generation. It impounds Upper Klamath Lake. Link River is owned by the U.S. Bureau of Reclamation

  • the John C. Boyle Dam, completed in 1958 for hydroelectric power, impounding the John C. Boyle Reservoir

  • the Iron Gate Dam, completed in 1964 for flood control and hydropower, the furthest downstream and the tallest dam in the system


  • Keno Dam, a non-generating dam impounding Lake Ewauna, built in 1967 to replace the wooden Needle Dam



Dam removal




Demonstrators calling for removal of dams on the Klamath River in Oregon and California, USA


As resolution of several long-range issues centered on water rights in the Klamath Basin, the multi-party Klamath Basin Restoration Agreement was signed in early 2008. Parties to the agreement included the state of California, the state of Oregon, three Native American tribes, four counties, and 35 other local organizations and individuals.[2]


At the time PacifiCorp faced a relicensing cycle with Federal Energy Regulatory Commission, with potentially expensive fixes for salmon passage and to address the growth of the toxic bacteria Microcystis aeruginosa in the Copco and Iron Gate Reservoirs.


On September 29, 2009, Pacificorp reached an agreement in principle with the other KBRA parties to remove the John C. Boyle Dam, the Iron Gate Dam, and Copco #1 and #2, pending Congressional approval.[3]


Congress did not act, so as of February 2016, the states of Oregon and California, the dam owners, federal regulators and other parties reached a further agreement to remove those four dams by the year 2020, contingent only on approval by the Federal Energy Regulatory Commission.[4] The new plan has been endorsed by the governors of California and Oregon, as well as the U.S. Secretary of the Interior.[5]



Link River Dam decommissioning


As a 50-year contract between the USBR and PacifiCorp reached its expiration in 2006,[6] the company proposed closing down hydroelectric generation at Link River. It cited the high costs of complying with fish passage remediation. This proposal would have left the dam in place for water storage and flood control.


As of 2014 the company intends to continue to generate electricity at Link River, in the short term and at reduced output. PacifiCorp implemented changes of operation are intended to reduce the destruction of two endangered species, the Lost River sucker and Shortnose sucker, by some 90%.[7] Further decommissioning discussion remains pending with the FERC.



References





  1. ^ "U.S. Fish and Wildlife Service Issues ESA Permit to PacifiCorp for Lost River and Shortnose Suckers". U.S. Fish and Wildlife Service. 20 February 2014. Retrieved 12 April 2016..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ "Klamath Basin Restoration Agreement" (PDF). Klamath Restoration. Retrieved 8 April 2016.


  3. ^ Fimrite, P. (30 September 2009). "Deal to raze 4 Klamath dams". San Francisco Chronicle.


  4. ^ Lochhead, Carolyn (3 February 2016). "New plan to remove Klamath River dams without help from Congress". SFGate.


  5. ^ Houston, Will (7 April 2016). "Klamath River dam removal deal signed by top federal, state officials". Eureka Times-Standard.


  6. ^ "Klamath Hydroelectric Project Description". U.S. Bureau of Reclamation. Archived from the original on 8 August 2011. Retrieved 12 April 2016.


  7. ^ "U.S. Fish and Wildlife Service Issues ESA Permit to PacifiCorp for Lost River and Shortnose Suckers". U.S. Fish and Wildlife Service. 20 February 2014. Retrieved 12 April 2016.




External links



  • 66-page project narrative history, commissioned by PacifiCorp








Comments

Popular posts from this blog

Information security

章鱼与海女图

Farm Security Administration