Line 11 (Shanghai Metro)











































































Line 11
SHM Line 11 icon.svg
Qilianshan Road Station.JPG
Overview
Other name(s) R3 (planned name)
Type Rapid transit
System Shanghai Metro
Status Chenxiang Road and Yanyu Road still under construction, other stations operate normally.
Locale
Shanghai (Pudong; Xuhui, Changning, Putuo, and Jiading districts)
Kunshan, Jiangsu
Termini
North Jiading / Huaqiao
Disney Resort
Stations 38
Daily ridership 920,000 (2017 peak)[1]
Operation
Opened December 31, 2009
Operator(s) Shanghai No.2 Metro Operation Co., Ltd.
Character Underground (from Yuqiao to Taopu Xincun and Shanghai Circuit station)
Elevated (from Disney Resort to Luoshan Road and Nanxiang to North Jiading and East Changji Road to Huaqiao)
Technical
Line length 82.4 km (51.20 mi)
Number of tracks 2
Track gauge
1,435 mm (4 ft 8 12 in)
Electrification
Overhead lines (1500 volts DC)
Operating speed 100 km/h (62 mph)






Line 11 is a northwest-southeast line of the Shanghai Metro network. Since October 2013 Line 11 serves Kunshan city also and it is the second intercity metro in China after the Guangfo Metro, and the first that crosses a provincial boundary. Services run at 5-minute intervals from either Huaqiao or North Jiading to Disney Resort (though a limited number of peak-hour services originating at Huaqiao terminate early at Sanlin). The line is colored brown on system maps.




To scale map of Shanghai Metro Line 11




Contents






  • 1 Service routes


  • 2 Stations


  • 3 History


  • 4 Rolling Stock


  • 5 References





Service routes




  • Disney Resort — North Jiading


  • Disney Resort — Huaqiao



Stations
































































































































































































































































































































































































Service
routes
Station name
Connections
Distance
km
Location

English

Chinese



Disney Resort

迪士尼

0.00
0.00

Pudong


Kangxin Highway

康新公路

5.08
5.08


Xiuyan Road

秀沿路

2.32
7.40


Luoshan Road

罗山路

 16 
1.78
9.18


Yuqiao

御桥

2.51
11.69


Yanyu Road

严御路

1.73
13.42


Pusan Road

浦三路

1.46
14.88


East Sanlin

三林东

1.58
16.46


Sanlin

三林

1.21
17.67


Oriental Sports Center

东方体育中心

 6   8 
3.13
20.8


Longyao Road

龙耀路

2.14
22.94

Xuhui


Yunjin Road

云锦路

0.76
23.70


Longhua

龙华

 12 
1.01
24.71


Shanghai Swimming Center

上海游泳馆

1.39
26.10


Xujiahui

徐家汇

 1   9 
1.85
27.95


Jiaotong University

交通大学

 10 
0.88
28.83

Changning


Jiangsu Road

江苏路

 2 
2.08
30.91


Longde Road

隆德路

 13 
1.35
32.26

Putuo


Caoyang Road

曹杨路

 3   4 
0.98
33.24


Fengqiao Road

枫桥路

0.81
34.05


Zhenru

真如

1.05
35.10


West Shanghai Railway Station

上海西站

China RailwayShanghai West railway station SXH
1.35
36.45


Liziyuan

李子园

1.45
37.90


Qilianshan Road

祁连山路

1.35
39.25


Wuwei Road

武威路

1.32
40.57


Taopu Xincun

桃浦新村

1.59
42.16


Nanxiang

南翔

3.13
45.29

Jiading


Chenxiang Road

陈翔路

2.36
47.65


Malu

马陆

3.40
51.05


Jiading Xincheng

嘉定新城

2.90
53.95


Baiyin Road

白银路

1.89
55.84


West Jiading

嘉定西

3.29
59.13


North Jiading

嘉定北

1.94
61.07



Shanghai Circuit

上海赛车场

3.15
64.22

Jiading


East Changji Road

昌吉东路

5.27
69.49


Shanghai Automobile City

上海汽车城

2.25
71.74


Anting

安亭

1.84
73.58


Zhaofeng Road

兆丰路

1.12
74.70

Kunshan
(Suzhou, Jiangsu)


Guangming Road

光明路

3.29
77.99


Huaqiao

花桥

1.27
79.26



History


The 1st phase of Line 11, which runs from North Jiading to Jiangsu Road, opened on 31 December 2009.[2][3] A branch line from Anting opened on 29 March 2010.[4]


The 2nd phase runs from Jiangsu Road to Luoshan Road. It opened on 31 August 2013.[5]


The 3rd phase connects Luoshan Road and the Disney Resort. This section is 9.4 kilometres (5.8 mi) long with 3 stations. All new stations except for the Disney Resort station opened on December 19, 2015.[6] The Disney Resort started to trial operation on April 26, 2016.[7]



























































Segment Commencement Length Station(s) Name
Jiangsu Road — North Jiading
31 December 2009
33.0 km (20.51 mi)
16
Phase 1 (main section)
Jiading Xincheng — Anting
29 March 2010
12.8 km (7.95 mi)
3
Phase 1 (branch section)
East Changji Road
26 April 2011
Infill station
1

Luoshan Road — Jiangsu Road
31 August 2013
19.2 km (11.93 mi)
12
Phase 2
Anting — Huaqiao
16 October 2013
7.0 km (4.35 mi)
3
Huaqiao extension
Kangxin Highway — Luoshan Road
19 December 2015
10.4 km (6.46 mi)
2
Disney extension (1st section)
Disney Resort — Kangxin Highway
26 April 2016
1.8 km (1.12 mi)
1
Disney extension (2nd section)


Rolling Stock



































Type Time of manufacturing Series Sets Assembly Notes
Type A 2008–2013 11A01 66 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Zhuzhou
Type A 2013 11A02 6 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Zhuzhou
Type A 2015-2016 11A03 10 Tc+Mp+M+M+Mp+Tc Manufactured by CSR Zhuzhou


References





  1. ^ 上海地铁客流再创新高 (in Chinese). Sina Weibo. 2017-03-10. Retrieved 2017-03-13..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ "Archived copy". Archived from the original on 2009-01-22. Retrieved 2008-11-11.CS1 maint: Archived copy as title (link)


  3. ^ "沪轨交9号线二期、11号线北段一期31日开通试运营".


  4. ^ 11号线支线下周一试运营, news.163.com. Retrieved 28 March 2010.


  5. ^ "Metro extension to open next year".


  6. ^ 上海市城市快速轨道交通近期建设规划(2010-2020年)环评报告 (in Chinese). Archived from the original on April 5, 2009. Retrieved 2009-04-06.


  7. ^ "上海地铁迪士尼站下周二开站 末班车最晚22:30". Xinmin.cn. 2016-04-21. Retrieved 2016-04-21.











Comments

Popular posts from this blog

Information security

Volkswagen Group MQB platform

New York City Police Department