Network SouthEast





































Network SouthEast
Network southeast logo.svg

465034 at Waterloo East.JPG
A Class 465 Networker at Waterloo East in 2003

Overview
Franchise(s) Not subject to franchising
Main region(s)
London, South East
Other region(s)
East of England, South West, West Midlands, East Midlands, Thames Valley
Fleet size Carriages: 6,700 (1986)
Stations called at 930 (1986)
Parent company British Rail

Network SouthEast (NSE) was one of the three passenger sectors of British Rail formed in 1982. NSE principally operated commuter trains in the London area and inter-urban services in densely populated South East England, although the network reached as far west as Exeter. Before 1986, the sector was known as London & South Eastern.


During the privatisation of British Rail it was gradually broken into a number of franchises.




Contents






  • 1 History


  • 2 Network Railcard


  • 3 Rolling stock


  • 4 Subdivisions


  • 5 Modernisation


    • 5.1 Chiltern Lines


    • 5.2 New trains




  • 6 Privatisation


  • 7 Legacy


  • 8 References


  • 9 Further reading


  • 10 External links





History




Two Class 309 (AM9) units; one in NSE livery, the other in Jaffa Cake livery





Class 411 (4CEP) in modified NSE livery with rounded corners




Transitional scene from BR Blue (the train) to NSE (the signage, train sticker) at Farnborough North station


Before the sectorisation of British Rail (BR) in 1982 the system was split into largely autonomous regional operations: those operating around London were the London Midland Region, Southern Region, Western Region and Eastern Region. Sectorisation of BR altered this setup by instead organising by the traffic type: commuter services in the south-east of England, long distance intercity services, local services in the UK regions, parcels and freight. The aim was to introduce greater budgetary efficiency and managerial accountability by building a more market-focused and responsive business, rather than privatising BR outright. It was expected that the London and South East sector would cover most of its operating costs from revenues, in contrast to heavily subsidised rural services.[1]


Upon sectorisation, the London & South Eastern sector took over responsibility for passenger services in the south-east of England,[2] working with the existing BR business units of Regions and Functions to deliver the overall service. Day-to-day operation, staffing and timetabling continued to be delivered by the Regions – and the sector came into existence with barely thirty staff based at Waterloo.[3]


On 10 June 1986, L&SE was relaunched as Network SouthEast, along with a new red, white and blue livery.[2][4][5] The relaunch was intended to be more than a superficial rebranding and was underpinned by considerable investment in the presentation of stations and trains, as well as efforts to improve service standards.[3] This approach was largely brought about by a new director, Chris Green, who had presided over similar transformation and rebranding of ScotRail.


Although NSE did not originally own or maintain infrastructure, it exercised control over almost all carrier core functions. NSE set its own goals and service standards in consultation with BR, and created its own management structure and oversight. BR allowed NSE to decide about scheduling, marketing, infrastructure enhancements, and rolling stock specifications on NSE-assigned lines and services.


In April 1990, British Rail Chairman Bob Reid announced that sectorisation would be made complete, with regions disbanded by 1991/92 and the individual sectors becoming directly responsible for all operations other than a few core long-term planning and standards functions. Network SouthEast thus went from a business unit of around 300 staff to a major business operation with 38,000 staff and a £4.7bn asset value – large enough to be ranked as the 15th-biggest business in the UK.[3]


Network SouthEast, like each other sector, was given primary responsibility for various assets (rolling stock, tracks, stations), and control resided with the primary user. Other sectors could negotiate access rights and rent facilities, using their own resources. NSE was able to exert much greater control and accountability over both its operating budget and service quality than BR could under its Regions. Relations were generally good between NSE and other sectors, although operating pressures sometimes forced staff to use equipment and assets belonging to other sectors to meet immediate needs.


On 1 April 1994, Network SouthEast was disbanded with its operations transferred to train operating units ready for privatisation.



Network Railcard



Although NSE ceased to exist in 1994, the grouping of services that it defined before privatisation remain grouped by the Network Railcard,[6] which can be bought for £30 and which offers a 34% discount for adults and 60% discount for accompanying children after 10:00 on weekdays and all day at weekends (subject to a minimum weekday fare of £13). Holders of annual season tickets for journeys within the Network area, including on London Underground, are issued with a "Gold Card" which gives them similar privileges to the Network Railcard.





Farringdon station with a Class 319 on a Thameslink service.





Class 487 at Waterloo with a Waterloo & City line service.



Rolling stock



















































































































































































































































































































































































































































Class Image Number Power Carriages Notes

03*
2 Diesel Shunter N/A Shunters at Ryde depot on the Isle of Wight.

05*
1 Diesel Shunter N/A Shunter at Ryde depot on the Isle of Wight, where it earned the nickname "Nuclear Fred". Replaced by two Class 03s, currently owned by the Isle of Wight Steam Railway.

08*
Class 08 08631.jpg Diesel Shunter N/A Examples include:

  • 08 800 'Ivor'

  • 08 631 'Eagle'

  • 08 641 'Dartmoor'


33 33114 at Ashford.jpg Diesel Locomotive N/A
47 NSE Class 47s.jpg Diesel Locomotive N/A
50 Grosmont Depot MMB 06 50027.jpg Diesel Locomotive N/A
73 6 Diesel Electric Locomotive N/A
86 86401 in Network SouthEast colours.jpg AC Electric Locomotive N/A
97 Departmental Locomotives and Shunters N/A Had ex-members of starred classes and worked across the NSE network.
101 L220 (Class 101) DMU.jpg Diesel Multiple Units (DMU) 2, 3 or 4
104 DMU 2,3, or 4
108 DMU 2,3 or 4
115 DMU 4
117 DMU 3
119 DMU 3
121 19880827-Paddington-Class121.jpg DMU 1 Worked the branches of the Thames valley.
159 Exeter Central Station - geograph.org.uk - 221514.jpg 30 DMU 3
165 165119 at Didcot Parkway.JPG 76 DMU 2 or 3
166 Oxford. - geograph.org.uk - 123732.jpg 21 DMU 3
203 Diesel Electric Multiple Unit (DEMU) 6
205 34 DEMU 3 or 4
207 19 DEMU 3
306 AC Electric Multiple Unit (AC EMU) 3
313 313 Original NSE livery.jpg 64 Dual Voltage EMU 3
315 19870823-LiverpoolStreet-Class315-F.jpg 61 AC EMU 4
316 British Rail Class 457 - unit 7001 - vehicle 67300.JPG 1 AC EMU 4 Converted to class 457.
317
Class 317 317319.jpg
72 AC EMU 4
319 St. Albans Station. - geograph.org.uk - 41180.jpg 86 Dual Voltage EMU 4
321 321401 - Rugby (8959162488).jpg 114 AC EMU 4
322 Stnstn.jpg 5 AC EMU 4
341, 342 Never built AC EMU Never built These classes were put forward for the rolling stock of the original Crossrail project.
365 365530 at Cambridge, 1997.jpg 41 AC EMU 4
371, 381, 471 Never built AC EMU Never built
411 1586 at London Victoria.jpg 135 DC EMU 4
413 29 DC EMU 4
414 209 DC EMU 2
415 Unknown DC EMU 4
416 416 at Dalton Kingsland2.jpg 128 DC EMU 2
419 10 DC Motor Luggage Van 1
421 1879 at London Charing Cross.jpg 166 DC EMU 4
423 3810 arriving at London Waterloo.jpg 196 DC EMU 4
432 15 DC EMU 4
438 Refurb4TC001.jpg 34 DC EMU 4
442 Christchurch. - geograph.org.uk - 58729.jpg 24 DC EMU 5
455 Class 455 at clapham junction station.jpg 137 DC EMU 4
456 Southern456015-WandsworthRoad-20040927.JPG 24 DC EMU 2
457 British Rail Class 457 - unit 7001 - vehicle 67300.JPG 1 DC EMU 4
465 MetCam and Brel at CX.jpg 147 DC EMU 4
466 43 DC EMU 2
482 65507 at Bank LUL station.jpg 10 DC Tube Train 2
Waterloo & City line 1992 stock, transferred to London Underground in 1994.
483 483 001 at St John's Road, 1989 - geograph.org.uk - 790855.jpg 10 DC Tube Train 2 Works on the Island line on the Isle of Wight. Following the retirement of the Classes 485 and 486, the class became the oldest to operate on the mainline.
485, 486 Shanklinstn.jpg 12 DC Tube Train 3 or 4 Worked on the Island line on the Isle of Wight. Replaced by Class 483s from 1989 onwards.
487 Old Waterloo & City line car at London Transport Museum Acton Depot (8649197945).jpg 28 DC Tube Train 2 Worked on the Waterloo & City line before being replaced by Class 482 in 1993.


Subdivisions


NSE was broken down into various sub-divisions.


































































































Subdivision
Main Route(s)
Route Description
Chiltern

Chiltern Main Line, London to Aylesbury Line
London Marylebone-Aylesbury/Banbury
Great Eastern

Great Eastern Main Line
London Liverpool Street-Ipswich/Harwich/Clacton-on-Sea/Walton-on-the-Naze/Southend Victoria
Great Northern

East Coast Main Line, Hitchin-Cambridge Line
London King's Cross-Peterborough/Cambridge (and subsequently London King's Cross-Cambridge-King's Lynn)
Island Line

Island Line
Ryde-Shanklin
Kent Link

North Kent Line, Bexleyheath Line, Dartford Loop Line, Mid-Kent Line, Catford Loop Line, Hayes Line
London Victoria/Charing Cross-Dartford/Gravesend/Gillingham/Orpington/Sevenoaks/Hayes
Kent Coast

Chatham Main Line, Hastings Line, Sheerness Line, South East Main Line
London Victoria/Charing Cross-Margate/Dover/Folkestone/Ashford/Tunbridge Wells/Hastings (and subsequently North Downs services as far as Redhill/Three Bridges)
London, Tilbury and Southend

LTS Line
London Fenchurch Street - Tilbury - Southend Central - Shoeburyness
North Downs

North Downs Line
Reading-Guildford-Reigate-Gatwick Airport-Tonbridge
Northampton Line/North London Lines

West Coast Main Line, Marston Vale Line, North London Line
London Euston/Broad Street-Watford-Milton Keynes-Northampton-Birmingham, Bedford-Bletchley
Solent and Wessex

Portsmouth Direct Line, South Western Main Line
London Waterloo-Guildford-Portsmouth, London Waterloo-Basingstoke-Southampton-Bournemouth-Weymouth
South London Lines

South London Lines, Oxted Line, Sutton & Mole Valley Lines
London Victoria & London Bridge to Croydon

London Victoria-East Grinstead/Uckfield/Sutton/Epsom Downs/Dorking/Horsham


South Western Lines

Alton Line, Waterloo-Reading Line South West London Suburban services via Wimbledon or Richmond to Chessington South/Epsom/Dorking/Effingham Junction/Guildford/Hampton Court/Woking/Weybridge/Hounslow loop/Windsor/Shepperton/Kingston loop.
London Waterloo-Alton/Reading/Windsor/Guildford/Epsom/Chessington South/Dorking/Hampton Court/Kingston Circle/Shepperton/Hounslow Circle/Weybridge
Sussex Coast

Brighton Main Line, Arun Valley Line, East Coastway Line, West Coastway Line
London Victoria/London Bridge-Gatwick Airport-Brighton/Eastbourne/Littlehampton, Brighton-Hastings, Brighton-Portsmouth-Southampton
Thames

Great Western Main Line, Cotswold Line Windsor branch
London Paddington-Slough- (-Windsor-) Reading-Oxford-Worcester/Stratford
Thameslink

Thameslink
Bedford-Luton-London-Gatwick Airport-Brighton
Waterloo & City

Waterloo & City line
Waterloo-Bank
West Anglia

Fen Line, Lea Valley Line
London Liverpool Street-Harlow-Cambridge-King's Lynn (express services to Cambridge, and almost all services to King's Lynn, were subsequently transferred to the Great Northern route from London King's Cross); London Liverpool Street-Stansted Airport, and local services: Liverpool Street-Chingford, Liverpool Street-Enfield Town, Liverpool Street-Cheshunt (via Seven Sisters), and Liverpool Street-Hertford East/Broxbourne (via Tottenham Hale).
West of England

West of England Main Line
London Waterloo-Basingstoke-Salisbury-Exeter


Modernisation


Soon after conception, Network SouthEast started to modernise parts of the network, which had become run down after years of under-investment. The most extreme example was the Chiltern Lines.



Chiltern Lines


The Chiltern Line ran on two railway lines (Chiltern Main Line and London to Aylesbury Line) from London Marylebone to Aylesbury and Banbury. These lines were former GWR and GCR intercity lines to Wolverhampton and Nottingham respectively. After the Beeching Axe in the 1960s, these lines became seriously run down with a lack of investment and a reduction of services.


By the late 1980s, the 25-year-old Class 115s needed replacement; the lines had low speed limits and were still controlled by semaphore signalling from the early 1900s; and Marylebone was served only by infrequent local trains to and from High Wycombe and Aylesbury.





Marylebone still with the red NSE livery for stations, around 30 years later in 2015. Marylebone was one of the stations given a facelift in the late 1980s.


NSE realised that something needed to be done to these lines quickly. Numerous plans for the lines were proposed. One serious plan was to close the line between Marylebone and South Ruislip/Harrow-on-the-Hill, and convert Marylebone into a coach station. Metropolitan line trains would be extended to Aylesbury and BR services from Aylesbury would be routed to London Paddington via High Wycombe. Also the line north of Princes Risborough would close. However, this did not happen as Baker Street and London Paddington would not have been able to cope with the extra trains and passengers.


What did happen was total route modernisation. This was an ambitious plan to bring the lines into the modern era of rail travel. Class 115s were replaced by new Class 165s. Semaphore signals were replaced by standard colour light signals and ATP was fitted on the line and trains. Speed limits were increased to 75 mph (only 75 due to running on London Underground track between Harrow and Amersham), all remaining fast loops at stations were removed and the line between Bicester North and Aynho Junction was singled. Stations were refurbished and even reconstructed (£10 million spent on stations alone), and signal boxes and the freight depots/sidings were demolished. Regular services to Banbury, and a few specials to Birmingham were introduced and a new maintenance depot was built at Aylesbury. This was a massive undertaking and work began in 1988 and by 1992, the route had been completely modernised, demand for the service had grown considerably and the route had become profitable.


Since modernisation the route has seen further improvements (see Chiltern Main Line).


Electrification was considered but was deemed to be too expensive as the Thames Line sector would then have to be electrified as well. Another reason electrification did not take place was that some part of the line ran on underground lines, which were electrified as 4-rail 660 V DC, while British Rail preferred 25 kV AC overhead traction for lines north of London.


Success of the modernisation implemented by NSE has made it possible for the Chiltern Main Line to compete with the West Coast Main Line between London and Birmingham, and there are now plans to increase speeds and quadruple sections of the line,[7] returning the line to the state it was before the Beeching Axe.



New trains





The later style of the Network SouthEast livery


Network SouthEast started a programme of replacing old rolling stock up to privatisation.




  • Chiltern - 165


  • Great Eastern - 321


  • Great Northern - 365


  • Island Line - 483 ex (London Underground 1938 Stock)


  • Kent Coast - 465, 466, 365


  • North Downs - 165, 166


  • Northampton Line - 321


  • Solent and Wessex - 442


  • South London Lines - 456


  • Thames - 165, 166


  • Thameslink 319


  • Waterloo & City - 482 (London Underground 1992 Stock)


  • West Anglia 315, 317, 322


  • West of England 159



Privatisation


During the privatisation of British Rail, NSE was divided up into several franchises:































































Original franchise Route(s) Currently
LTS Rail London, Tilbury & Southend Rebranded c2c
Chiltern Railways
Chiltern Main Line, London to Aylesbury Line, Princes Risborough to Aylesbury Line, Leamington to Stratford Line and the Oxford to Bicester Line
Unchanged
Great Eastern Railway Great Eastern Rebranded as First Great Eastern, then merged into larger franchise operated by National Express East Anglia, then passed on to Abellio Greater Anglia in 2012
Thames Trains Thames
North Downs (Gatwick/Redhill - Dorking/Guildford/Reading section)
Franchise passed to First Great Western Link, later merged into larger franchise operated by First Great Western (later Great Western Railway)
Island Line Island Line Operated by Stagecoach from 1996 until 2017 retaining Island Trains brand, now operated by South Western Railway
North London Railways Northampton Line
North London Line
Rebranded as Silverlink, later split up into two franchises operated by London Midland (Northampton) and London Overground (North London)
South Eastern Kent Coast, Kent Link, North Downs (Tonbridge- Redhill section) Rebranded as Connex South Eastern, then passed to South Eastern Trains, then to Southeastern
Network SouthCentral
South London Line
Sussex Coast
Rebranded as Connex South Central, then passed to Southern
Thameslink Thameslink Merged into larger franchise operated by First Capital Connect, became part of Govia Thameslink Railway in 2014
West Anglia Great Northern Great Northern
West Anglia
Split with GN merged into First Capital Connect, now part of Govia Thameslink Railway) and WA merged into National Express East Anglia, then passed on to Abellio Greater Anglia in 2012. Some of the Abellio Greater Anglia lines have been passed onto TfL Rail (part of Crossrail) and London Overground
South West Trains Solent & Wessex
South Western Line
West of England Line
Operated by Stagecoach from 1996 until 2017, but retained South West Trains branding, now operated by South Western Railway

One element of NSE that remained in public ownership was the Waterloo & City Line; too small to be operated as a self-contained franchise, it was not incorporated with the rest of NSE services from Waterloo into the South West Trains operation, and was instead transferred to London Underground.[8]



Legacy




NSE-era signage at Old Street station in September 2008


Although NSE ceased operations in 1994, its logos, livery and signage would linger well into the following decades. Southeastern, Southern and First Capital Connect trains continued to run in NSE livery until as late as 2007.[9]


Underground stations on the Moorgate branch of the Great Northern route (Highbury & Islington, Essex Road, Old Street and Moorgate) used to have the NSE era colour schemes after going through 3 privatised operators (WAGN, First Capital Connect and Great Northern) until late-2018. [10]


NSE signage and logos can be found across the Island Line, Isle of Wight, with particularly well-maintained examples existing at the Ryde Pier Head and Shanklin ticket offices.


The last train still in NSE livery was withdrawn on 15 September 2007 when 465193, was sent for revinyling.[11]


On 28 August 2015, the Network SouthEast Railway Society, obtained the trademark of Network SouthEast's brandname, logo and typeface[12]. The group wanted to obtain the trademark to help Network SouthEast's name and legacy live on following its demise and educate about NSE[13].


In 2017, the Railway Heritage Trust collaborated with train operator Govia Thameslink Railway to recreate the Network SouthEast image at Downham Market station as a commemorative measure. The station has been equipped with paintwork and signage that mimic the Network SouthEast branding of the late 1980s.[14][dead link]



References





  1. ^ Mark Lawrence: Network SouthEast - From Sectorization to Privatisation. Sparkford, Oxford Publishing Co. 1994


  2. ^ ab Thomas, David St John; Whitehouse, Patrick (1990). BR in the Eighties. Newton Abbot: David & Charles. ISBN 0-7153-9854-7..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output .citation q{quotes:"""""""'""'"}.mw-parser-output .citation .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-ws-icon a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-maint{display:none;color:#33aa33;margin-left:0.3em}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  3. ^ abc Green, Chris; Vincent, Mike (2014). The Network SouthEast Story. Oxford Publishing Co. ISBN 9780860936534.


  4. ^ "Network SouthEast". Jane's Railway Year. 6: 4–11.


  5. ^ "How the Network SouthEast was won" Rail Magazine issue 747 30 April 2014 page 72


  6. ^ "Network Railcard". Archived from the original on 2 November 2007. Retrieved 2 November 2007.


  7. ^ "Network Rail route plan for Chilterns November 2007" (PDF).


  8. ^
    "Waterloo & City Line". Clive's Underground Line Guides. Clive Feather. 14 December 2007. Retrieved 30 June 2008.



  9. ^ https://youtube.com/watch?v=M5eJ9Jv1XwQ


  10. ^ https://youtube.com/watch?v=VLUBW4XhU2c&t=66s


  11. ^ "After 21 years, no more NSE" Rail Magazine issue 575 26 September 2007 page 9


  12. ^ Intellectual Property Office (28 August 2015). "Trade mark number - UK00003110943". trademarks.ipo.gov.uk. Retrieved 23 May 2018.


  13. ^ Shepherd, John (6 October 2016). "Network SouthEast TRADEMARK INFORMATION". Network SouthEast Railway Society. Retrieved 23 May 2018.


  14. ^ Heritage makeover unveiled at Downham Market railway station Lynn News 4 May 2017




Further reading




  • Brown, David; Jackson, Alan A. (1990). Network Southeast Handbook. Capital Transport. ISBN 978-1-85414-129-3.


  • Green, Chris; Vincent, Mike (2014). The Network SouthEast Story. OPC. ISBN 9780860936534. OCLC 872707499.


  • British Railways Board: London and South East Commuter Services, 1980 Competition Commission report


  • British Railways Board: Network South East, 1987 Competition Commission report


  • "Network SouthEast: Planning for the 1990s". Rail Magazine. No. 88. EMAP National Publications. January 1989. Supplement (32 centre pages). ISSN 0953-4563. OCLC 49953699.


  • "Network SouthEast: The prospects ahead". Rail Magazine. No. 107. EMAP National Publications. 19 October – 1 November 1989. pp. 24–31. ISSN 0953-4563. OCLC 49953699.



External links







  • NSE Pages - Information and enthusiast website

  • Network SouthEast Railway Society

  • Pictures of Chiltern Lines prior to Total Route Modernisation

  • Network SouthEast Years - Timetables, Maps, Publicity Leaflets, Tickets and much more.









Comments

Popular posts from this blog

Information security

Volkswagen Group MQB platform

刘萌萌