Grand Duchy of Baden State Railway








Plan of the railway lines in Baden 1870


The Grand Duchy of Baden was an independent state in what is now southwestern Germany until the creation of the German Empire in 1871. It had its own state-owned railway company, the Grand Duchy of Baden State Railways (Großherzoglich Badische Staatseisenbahnen or G.Bad.St.E.), which was founded in 1840. At the time when it was integrated into the Deutsche Reichsbahn in 1920, its network had an overall length of about 2,000 kilometres (1,200 mi).




Contents






  • 1 History


    • 1.1 Foundation


    • 1.2 Development of the main lines


    • 1.3 Links to neighbouring states


    • 1.4 Further expansion


    • 1.5 State-run private railways


    • 1.6 Merger into the Reichsbahn


    • 1.7 Electric operations




  • 2 The network


  • 3 Running and rolling stock


  • 4 See also


  • 5 Sources


  • 6 External links





History



Foundation




Baden premium bond from 1845/49 issued to finance railway construction.


Baden was the second German state after the Duchy of Brunswick to build and operate railways at state expense. In 1833 a proposal for the construction of a railway from Mannheim to Basle was put forward for the first time by Mannheim businessman, Ludwig Newhouse, but initially received no support from the Baden state government. Other proposals too by, for example Friedrich List, were unsuccessful at first. Not until the foundation of a railway company in the neighbouring French province of Alsace, for the construction of a line from Basle to Strasbourg in 1837, did any serious planning begin for the building of a railway in Baden in order to avoid the loss of trade routes to Alsace. At an extraordinary meeting of the state parliament, the Baden legislature passed three laws on 29 March 1838 for the construction of the first route between Mannheim and the Swiss border at Basle, as well as a stub line to Baden-Baden and a branch to Strasbourg. The construction of the railway line was to be funded by the state, something that had been championed especially by Karl Friedrich Nebenius. In September 1838 work started.


The Ministry of the Interior was responsible for the construction of the railway, setting up for that purpose its own authority, the 'Railway Construction Division'. Later the railway construction authorities were incorporated into the 'Water and Road Construction Division'. Responsibility for the operation of the railway was, by contrast, given to the Foreign Ministry because it took over the running of the Postal Division, that from then on became the 'Post and Railway Division'. Not until the merger of the Baden Post Office into the Reichspost in 1872 did a separate railway administration emerge in Baden: the Grand Duchy of Baden State Railways.




Departure of a train from Heidelberg station, 1840.



Development of the main lines


The first route, called the Baden Mainline (Badische Hauptbahn), was built in sections between 1840 and 1863. The first, 18.5 km long, section between Mannheim and Heidelberg was taken into service on 12 September 1840. Other sections followed: to Karlsruhe in 1843, Offenburg in 1844, Freiburg im Breisgau in 1845, Schliengen in 1847, Efringen-Kirchen in 1848 and Haltingen in 1851. The branches to Kehl and Baden-Baden were opened as early as 1844 and 1845 respectively. The extension of the main line through Basle territory required negotiations with the Swiss Confederation, during which differences of opinion over the best place for the junction of the Baden line to the Swiss network – Basle or Waldshut – led to delays.




Konstanz station still has today a slim clock tower typical of former Baden stations.


In the state treaty of 27 July 1852 an accommodation was reached which enabled the construction and operation of a line on Swiss sovereign territory by the Baden State Railways.


The Baden railway lines were initially laid to the 1,600 mm (5 ft 3 in). After it turned out that all her neighbouring states had opted for 1,435 mm (4 ft 8 12 in) standard gauge rail, the Baden State Railways rebuilt all their existing routes and rolling stock to standard gauge within just one year during 1854/55.


The line reached Basle in 1855, Waldshut in 1856 and Konstanz in 1863. With that the 414.3 km long Baden main line was completed.
After the all-important north-south axis as well as links to the Lake Constance region had been established by the Baden Mainline, the remaining network expansion plans concentrated on opening up the area of Pforzheim with the Karlsruhe–Pforzheim–Mühlacker route (opened 1859–1863), linking up the Odenwald and Tauberfrankens with the Baden Odenwald Railway (Heidelberg–Mosbach–Würzburg, opened 1862–1866) and forging a direct link from Karlsruhe to Konstanz, without the diversion via Basle, in the shape of the Black Forest Railway (opened 1866–1873).



Links to neighbouring states


Even when the Baden Mainline was being built, plans were already being formulated to link up with the Swiss railway network. This was not achieved until the bridge at Waldshut over the river Rhine, built by Robert Gerwig, was completed on 18 August 1859. Other links were made in 1863 at Schaffhausen, in 1871 at Konstanz and in 1875 at Singen. The Basle link line, which connected Baden station on the east of the Rhine with the Central station west of the Rhine, was opened in 1873. Today it is the most important railway connexion between Germany and Switzerland.


The connexion to the north towards Weinheim-Darmstadt–Frankfurt (Main) had been established since 1846 by the Main-Neckar Line, in which the Grand Duchy of Baden participated. In 1879 the Ried Railway (Riedbahn) followed, although Baden did not own any section of it.


From 1861 there had also been a direct route to France after the completion of the Rhine bridge between Kehl and Strasbourg. The opening up of the Palatinate (Pfalz) was first realised in 1865 with a pontoon bridge from Karlsruhe–Maxau as well as a link between Mannheim and Ludwigshafen in 1867. A connexion with Bavaria followed the opening of the Baden Odenwald Railway (Baden Odenwaldbahn) in 1866.


Negotiations for a route to Württemberg were particularly difficult because both states were competing for traffic between Germany and the Alpine passes. While Baden favoured a line via Pforzheim, Württemberg was interested in a more direct connexion at Bruchsal. An agreement was finally reached in the state treaty of the 4 December 1850, whereby Württemberg was granted the right to build the direct Stuttgart–Mühlacker–Bretten–Bruchsal route (Württemberg Western Railway) even on Baden territory, while Baden was permitted to build and operate the Karlsruhe–Mühlacker line, which ran partly in Württemberg. The connexion with Bruchsal was taken into service in 1853.



Further expansion




Construction of the strategic railway line in south Baden and the Danube valley between 1887 and 1890


The subsequent expansion of Baden’s railway network was either aimed at opening up the regions or carried out from a military perspective. Worth mentioning are:



  • The Neckar Valley Railway (Neckartalbahn), Neckargemünd–Eberbach–Jagstfeld, opened in 1879

  • The Höllental Railway (Höllentalbahn), Freiburg im Breisgau–Neustadt (Schwarzwald), opened in 1887

  • The strategic diversions on the Upper Rhine: Weil am Rhein–Lörrach, Wehra Valley Railway (Wehratalbahn) and the completion of the Wutach Valley Railway (Wutachtalbahn) all between 1887 and 1890

  • The strategic Rhine Railway, Mannheim–Graben-Neudorf–Karlsruhe–Rastatt–Roeschwoog (Elsass), opened in 1895


Around 1895, Baden’s railway network was more or less finished bar a few small sections. In 1900 it had a track length of 1996 km, of which 1521 km was owned by the State Railways. In the succeeding years the main effort was the expansion of stations which formed railway hubs. The most important conversions were:



  • New marshalling yard at Karlsruhe, 1895

  • New station at Rastatt, 1895

  • New goods relief line at Freiburg im Breisgau, 1905

  • New goods station at Basle, 1905

  • New goods relief line at Bruchsal, 1906

  • New marshalling yard in Mannheim, 1906–1907

  • New station at Offenburg with a marshalling yard, 1911

  • New Baden station in Basle with new adjoining marshalling yard to the north at Weil am Rhein, 1913

  • New central station at Karlsruhe, 1913

  • New marshalling yard and goods station at Heidelberg, 1914


The newly built Heidelberg central station could not be completed due to the start of the First World War. Its completion had to be delayed until 1955.



State-run private railways


Several routes in Baden were built by private concerns, but operated by the State Railways and, in most cases, subsequently taken over. These were not just branch lines of purely local significance like the Wiese Valley Railway (Wiesentalbahn) (Basle–Schopfheim–Zell im Wiesental), opened in 1862, but also main lines. In addition to attempts by towns, that still had no railway connexion and wanted better access to the railway network, the large cities in the state also got involved in railway line construction, in order to open up their environs and to strengthen their position as transport hubs. For example, the city of Mannheim built a direct railway line to Karlsruhe without having to go via Heidelberg, in order to step out of the shadows into which they had fallen when the Badische Haupt Railway was married up at Friedrichsfeld and Heidelberg with the Main-Neckar Line that ran on northwards. In a countermove the city of Heidelberg pressed for the construction of the Heidelberg–Schwetzingen–Speyer route, in order to secure its importance as a transport hub.


The most important of the privately built lines operated by the State Railways were:



  • The Maxau Railway (Maxaubahn) at Karlsruhe an den Rhein, built by the city of Karlsruhe, opened in 1862, was the first link between Baden’s railways and those of the Palatinate. It was nationalised in 1906.

  • The Rhine Railway (Rheinbahn) Mannheim–Schwetzingen–Graben-Neudorf–Eggenstein–Karlsruhe, built by the city of Mannheim, opened in 1870 and taken over by the Baden State Railways on the day it opened.

  • The Kraichgau Railway (Kraichgaubahn) Karlsruhe–Bretten–Eppingen with its extension to Heilbronn, built by the city of Karlsruhe, opened in 1879 and taken over by the Baden State Railways on the day it opened.



Merger into the Reichsbahn




Plan of the railway lines built before 1945 in Baden


On the formation of the Deutsche Reichsbahn on 1 April 1920 the Baden State Railways were merged into it. The head office in Karlsruhe became the Karlsruhe Reichsbahn Division. The foundation of the Reichsbahn meant that a wish list of routes in Baden was cancelled and only four new lines were built:



  • The extension of the Rench Valley Railway (Renchtalbahn) to Bad Peterstal in 1926 and Bad Griesbach in 1933

  • The Three Lakes Line Titisee–Seebrugg in 1926

  • The gap in Murg Valley Railway (Murgtalbahn) in 1928

  • The Neckarsteinach–Schönau (Odenwald) stub line in 1928


Construction work on a railway connexion from Bretten to Kürnbach (with a planned junction to the Zabergäu Railway (Zabergäubahn) at Leonbronn) was begun, but the line was never completed.



Electric operations


The Baden State Railways began electric railway operations on 13 September 1913 with opening of the 15 KV AC, 16​23 Hz Wiese Valley Railway, Basel–Zell im Wiesental, and on its Schopfheim–Bad Säckingen branch. In addition to an experimental Class A¹ locomotive, eleven Class A² and A³ (DRG Class E 61) electric locomotives were procured. All had side-rods driving three axles. The electrification of the Wiesen valley line was mainly done in order to trial electric traction; it had no great significance in terms of traffic. No further expansion of electric services was carried out after the First World War due to the serious economic situation and it was not until 1952 that the electrification of Baden’s railway network was begun in earnest.



The network


The railway lines in Baden State Railway network were opened as follows:












































































































































































































































































































































































































































Section
As part of the route:
Opened on

Mannheim–Heidelberg
Rhine Valley Railway 12 September 1840

Heidelberg–Karlsruhe
Rhine Valley Railway 10 April 1843

Karlsruhe–Ettlingen–Rastatt
Rhine Valley Railway 1 May 1844

Rastatt–Baden-Oos
Rhine Valley Railway 6 May 1844

Baden-Oos–Offenburg
Rhine Valley Railway 1 June 1844

Appenweier–Kehl
Appenweier–Strasbourg railway 1 June 1844

Baden-Oos–Baden-Baden
27 July 1845

Offenburg–Freiburg im Breisgau
Rhine Valley Railway 1 August 1845

Freiburg im Breisgau–Müllheim (Baden)
Rhine Valley Railway 1 June 1847

Müllheim (Baden)–Schliengen
Rhine Valley Railway 15 June 1847

Schliengen–Efringen-Kirchen
Rhine Valley Railway 8 November 1848

Efringen-Kirchen–Haltingen
Rhine Valley Railway 22 January 1851
Port line Mannheim
9 November 1854

Haltingen–Basel Baden station
Rhine Valley Railway 20 February 1855

Basle Baden station–Bad Säckingen
Upper Rhine Railway 4 February 1856

Bad Säckingen–Waldshut
Upper Rhine Railway 30 October 1856

Durlach–Wilferdingen-Singen
Karlsruhe–Mühlacker 10 August 1859

Waldshut–Koblenz ¹
Waldshut–Turgi 18 August 1859

Kehl–Straßburg ¹
Appenweier–Strasbourg railway 11 May 1861

Wilferdingen-Singen–Pforzheim
Karlsruhe–Mühlacker 4 July 1861

Heidelberg–Meckesheim–Mosbach
Baden Odenwald Railway 23 October 1862

Pforzheim–Mühlacker
Karlsruhe–Mühlacker 1 June 1863

Waldshut–Schaffhausen–Singen–Konstanz
Upper Rhine Railway 13 June 1863

Offenburg–Hausach
Black Forest Railway (Baden) 2 July 1866

Mosbach–Osterburken–Lauda–Heidingsfeld
Baden Odenwald Railway 25 August 1866

Singen–Engen
Black Forest Railway 6 September 1866

Radolfzell–Stockach
Hegau-Ablachtal Railway 20 July 1867

Mannheim–Ludwigshafen am Rhein ¹
Mannheim–Ludwigshafen 10 August 1867

Lauda–Hochhausen
Tauber Valley Railway 10 October 1867
Engen–Donaueschingen
Black Forest Railway 15 June 1868

Meckesheim–Bad Rappenau
Elsenz Valley Railway 25 June 1868
Hochhausen–Wertheim
Tauber Valley Railway 15 October 1868

Bad Rappenau–Jagstfeld
Elsenz Valley Railway 5 August 1869

Donaueschingen–Villingen
Black Forest Railway 16 August 1869

Königshofen–Bad Mergentheim
Tauber Valley Railway 23 October 1869

Stockach–Meßkirch
Hegau-Ablachtal Railway 3 February 1870

Weil am Rhein–Saint-Louis ¹
11 February 1872

Schwackenreute–Pfullendorf
Altshausen–Schwackenreute railway 11 August 1873

Meßkirch–Mengen
Hegau-Ablachtal Railway 6 September 1873

Krauchenwies–Sigmaringen
Sigmaringen–Krauchenwies railway 6 September 1873

Hausach–Villingen
Black Forest Railway 1 November 1873

Bruchsal–Graben-Neudorf–Rheinsheim
Bruchsal–Germersheim 23 November 1874

Lauchringen–Stühlingen
Wutach Valley Railway 22 April 1875

Stühlingen–Weizen (bei Stühlingen)
Wutach Valley Railway 15 October 1876
Rheinsheim–Germersheim ¹ Bruchsal–Germersheim 15 May 1877

Müllheim–Neuenburg am Rhein–Mülhausen ¹
Müllheim–Mulhouse railway 6 February 1878

Hausach–Wolfach
Kinzig Valley Railway 15 July 1878

Neckargemünd–Eberbach–Jagstfeld
Neckar Valley Railway 24 May 1879

Mannheim-Friedrichsfeld–Schwetzingen
1 June 1880

Wolfach–Schiltach
Kinzig Valley Railway 4 November 1886

Freiburg im Breisgau–Neustadt (Black Forest)
Höllental Railway 23 May 1887

Weil am Rhein–Lörrach
20 May 1890

Schopfheim–Bad Säckingen
Wehra Valley Railway 20 May 1890
Weizen (near Stühlingen)–Immendingen
Wutach Valley Railway 20 May 1890

Seckach–Walldürn
Seckach–Miltenberg 1 December 1887

Graben-Neudorf–Blankenloch–Karlsruhe–
Durmersheim–Rastatt–Roppenheim (Alsace)¹
Rhine Railway 1 May 1895
New Karlsruhe marshalling yard
1 May 1895
Karlsruhe marshalling yard–Karlsruhe West–Knielingen 1 May 1895

Stahringen–Überlingen
Bodenseegürtel Railway 18 August 1895

Walldürn–Amorbach ¹
Seckach–Miltenberg 20 September 1899

Steinsfurt–Eppingen
15 November 1900

Waldkirch–Elzach
Elz Valley Railway 20 August 1901

Neustadt (Black Forest)–Donaueschingen
Höllental Railway 20 August 1901

Überlingen–Friedrichshafen ¹
Bodenseegürtel Railway 1 October 1901

Oberuhldingen–Unteruhldingen
2 October 1901
Marbach (near Villingen)–Bad Dürrheim
31 July 1904

Freiburg im Breisgau goods relief line
4 September 1905

Mannheim-Rheinau–Brühl (Baden)
Rheinau–Ketsch 1 October 1905
Mimmenhausen-Neufrach–Frickingen
1 December 1905
New Basel goods station 15 December 1905

Bruchsal goods relief line
29 January 1906
New Mannheim marshalling yard, southern section 1 October 1906
New Mannheim marshalling yard, northern section 1 May 1907

Kappel-Gutachbrücke – Lenzkirch – Bonndorf
24 September 1907

Weisenbach–Forbach
Murg Valley Railway 15 June 1910
New Offenburg station and Windschläg–Offenburg goods line 6 November 1911

Walldürn–Hardheim

Walldürn–Hardheim
23 November 1911

Brühl (Baden)–Ketsch
Rheinau–Ketsch 1 July 1912
New Basle Baden station
13 September 1913
New Karlsruhe central station
23 October 1913

Singen–Beuren-Büßlingen
21 November 1913
New Heidelberg goods station 2 March 1914

Tauberbischofsheim–Königheim

Tauberbischofsheim–Königheim
1 December 1914

Forbach–Raumünzach
Murg Valley Railway 4 June 1915

On the cross-border lines marked with ¹ only the section as far as the border belonged to the Baden State Railways. The Basle link line was built by the Swiss Central Railway and co-financed by the Baden State Railway. The state railway had a special role for the only narrow gauge line, from Mosbach–Mudau, that opened on 3 June 1905. The firm of Vering & Waechter were contracted to build and run this line.


State-operated private lines:















































































































Section
As part of the route
Opened on
Built by

Basel Baden station–Schopfheim
Wiese Valley Railway 7 June 1862 Wiesental Railway Company

Karlsruhe–Maxau
Maxau Railway 5 August 1862 City of Karlsruhe

Maxau–Maximiliansau ¹
Maxau Railway 8 May 1865 City of Karlsruhe
Dinglingen–Lahr (Black Forest) 15 November 1865 Lahr Railway Company

Rastatt–Gernsbach
Murg Valley Railway 1 June 1869 Murgthal Railway Company

Mannheim–Schwetzingen–Graben-Neudorf–
Eggenstein–Karlsruhe
Rhine Railway 4 August 1870 City of Mannheim

Freiburg im Breisgau–Breisach
6 February 1871 City of Freiburg, Town of Breisach

Heidelberg–Schwetzingen
Heidelberg–Speyer 17 July 1873 N.N.

Schwetzingen–Speyer
Heidelberg–Speyer 10 December 1873 N.N.

Denzlingen–Waldkirch
Elz Valley Railway 1 January 1875 Town of Waldkirch

Schopfheim–Zell im Wiesental
Wiese Valley Railway 5 February 1876 Schopfheim-Zeller Railway Company

Appenweier–Oppenau
Rench Valley Railway 1 June 1876 Renchtal Railway Company

Breisach–Colmar ¹
Freiburg–Colmar 5 January 1878 City of Freiburg, Breisach, Baden

Grötzingen–Bretten–Eppingen
Kraichgau Railway 15 October 1879 Town of Karlsruhe

Ettlingen West–Ettlingen Erbprinz
Alb Valley Railway 25 August 1885 Town of Ettlingen

Ettlingen Erbprinz–Ettlingen Stadt
Alb Valley Railway 15 July 1887 Town of Ettlingen

Gernsbach–Weisenbach
Murg Valley Railway 1 May 1894 Murgthal Railway Company

Apart from the Ettlingen West–Ettlingen Stadt line, taken over by the B.L.E.A.G. (Baden Branch Lines) on 1 January 1899, all state-operated private lines went into state ownership over the course of time. In addition to those lines run by the Baden State Railways there were also fully private lines after 1889 that are not listed.


The Deutsche Reichs Railway completed the following routes within the Baden railway network by 1945:











































Section
As part of the route
Opened on

Oppenau–Bad Peterstal
Rench Valley Railway 28 November 1926

Titisee–Seebrugg
Three Lakes Line 1 December 1926
Raumünzach–Klosterreichenbach
Murg Valley Railway 13 April 1928

Neckarsteinach–Schönau (Odenwald)
Neckarsteinach–Schönau 21 October 1928

Bad Peterstal–Bad Griesbach
Rench Valley Railway 25 May 1933

Tuttlingen–Hattingen (Baden)
Gäu Railway (Stuttgart–Singen) 15 May 1934

Freiburg im Breisgau–Freiburg-Wiehre
Höllental Railway 8 November 1934

In addition several routes were built by foreign state railways that ran through Baden territory. The section from Bretten to Bruchsal was transferred in 1878 to the ownership of the Baden State Railways.

























































































































































Section
As part of the route
Opened on
Operator

Heidelberg–Weinheim–Frankfurt (Main)
Main-Neckar Line 1 August 1846
Main-Neckar Line

Mühlacker–Bretten–Bruchsal
Württemberg Western Railway 1 December 1853
K.W.St.E.

Pforzheim–Bad Wildbad
Enz Valley Railway 11 June 1868
K.W.St.E.

Rottweil–Villingen
26 August 1869
K.W.St.E.

Jagstfeld–Osterburken
27 September 1869
K.W.St.E.

Tuttlingen–Immendingen
Danube Valley Railway 26 July 1870
K.W.St.E.

Konstanz–Kreuzlingen Hafen–Romanshorn
Seelinie 1 July 1871
Swiss Northeast Railway

Basel Baden station–Basel Central station
Basel Link Line 3 November 1873
Swiss Central Railway

Pforzheim–Calw
Nagold Valley Railway 1 June 1874
K.W.St.E.

Singen–Etzwilen–Winterthur
17 July 1875
Swiss National Railway

Konstanz–Kreuzlingen–Etzwilen
17 July 1875
Swiss National Railway

Pfullendorf–Aulendorf
14 August 1875
K.W.St.E.

Mannheim Neckarstadt–Biblis
Ried Railway 15 October 1879
Hessian Ludwig Railway

Mannheim-Waldhof–Käfertal–Mannheim Haupt station
Ried Railway 1 May 1880
Hessian Ludwig Railway

Schwaigern–Eppingen
Kraichgau Railway 18 August 1880
K.W.St.E.

Lohr–Wertheim
Main Valley Railway 1 October 1881
K.Bay.Sts.B

Erbach–Eberbach
Odenwald Railway 27 May 1882
Hessian Ludwig Railway

Freudenstadt–Schiltach
Kinzig Valley Railway 4 November 1886
K.W.St.E.

Tuttlingen–Sigmaringen
Danube Valley Railway 27 November 1890
K.W.St.E.

Schramberg–Schiltach
9 November 1892
K.W.St.E.

Weinheim–Fürth (Odenwald)
Weschnitz Valley Railway 1895
Prussian-Hessian Railway Company

Schaffhausen–Jestetten–Eglisau
1 June 1897
Swiss Northeast Railway

Weinheim–Lampertheim
Weinheim–Worms railway 1905
Prussian-Hessian Railway Company

Miltenberg–Wertheim
Main Valley Railway 1 October 1912
K.Bay.Sts.B


Running and rolling stock


The first two steam locomotives for the Baden State Railways were built by the English locomotive works of Sharp, Roberts and Company and delivered in 1839. They were given the names Löwe and Greif (Lion and Griffin). As the railway network expanded the size of the fleet grew rapidly. When the railways were converted from broad to standard gauge in 1854/55 there were already 66 locomotives, 65 tenders and 1133 wagons in the fleet. At the end of the First World War the vehicle inventory included 915 locomotives, 27,600 goods wagons and 2,500 passenger coaches, of which 106 locomotives, 7,307 goods wagons and 400 passenger coaches had to be given to the victorious powers as reparations in accordance with the Versailles Treaty. An overview of Baden's locomotive classes may be found in the List of Baden locomotives and railbuses.


The Baden State Railways fostered the growth of an indigenous railway vehicle industry in Baden, because they preferred to buy from local firms such as the engineering works of Kessler and Martiensen in Karlsruhe, which later became the Maschinengesellschaft Karlsruhe ('Karlsruhe Engineering Company'). And two coach manufacturers emerged in Baden in the shape of Waggonfabrik Fuchs founded in Heidelberg in 1862 and Waggonfabrik Rastatt in 1897.



See also



  • List of Baden locomotives and railbuses

  • Grand Duchy of Baden



Sources



  • Karl Müller, Die badischen Eisenbahnen in historisch-statistischer Darstellung. Heidelberger Verlagsanstalt und Druckerei, Heidelberg 1904 (Online-Version)

  • Albert Kuntzemüller, Die Badischen Eisenbahnen. Verlag G. Braun, Karlsruhe 1953

  • Wolfgang von Hippel, Joachim Stephan, Peter Gleiber, Hans-Jürgen Enzweiler, Eisenbahn-Fieber: Badens Aufbruch ins Eisenbahnzeitalter. Verlag Regionalkultur, 1990

  • Fridolin Schell, 110 Jahre Eisenbahndirektion Karlsruhe. Eisenbahn-Kurier Verlag, 1982



External links



  • Laws and state treaties concerned with the Baden railways

  • Vehicles of the Baden state railways