Thomson–East Coast MRT line






















































































MRT Singapore Destination 13.pngMRT Singapore Destination 14.png
Thomson–East Coast line

TE2 Woodlands Under Construction.jpg

Woodlands MRT Station (TEL) under construction

Overview
Native name Malay: Laluan MRT Thomson-Pantai Timur
Chinese: 汤申-东海岸地铁线
Tamil: தாம்சன் - ஈஸ்ட் கோஸ்ட் எம்ஆர்டி வழி
Type Rapid transit
System Mass Rapid Transit (Singapore)
Status Under construction
Termini
Woodlands North
Sungei Bedok
Stations 32 (under construction)
Services 1
Daily ridership 500,000 (expected)
Operation
Planned opening 2019 (Stage 1)
2020 (Stage 2)
2021 (Stage 3)
2023 (Stage 4)
2024 (Stage 5)
2025 (Founders' Memorial MRT station)
Owner Land Transport Authority
Operator(s)
SMRT Trains (SMRT Corporation)
Character Fully Underground
Depot(s)
Mandai (Future)
East Coast (Future)
Rolling stock CT251
Technical
Line length 43 km (27 mi)
Track gauge
1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC Third Rail[1]
Operating speed 90 km/h (56 mph)



Route map

MRT map TS.svg

The Thomson–East Coast line (TEL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore that is currently under construction, being the sixth line to be built. The line was announced on 15 August 2014 by the Land Transport Authority as the merger of the Thomson line (TSL) and the Eastern Region line (ERL).[2] The stretch from Woodlands North to Gardens by the Bay costs S$18 billion. The line will open in five stages from 2019 onwards, and interchanges with all existing lines. When the line fully opens, it is expected to serve about 500,000 commuters daily in the initial years, rising to one million commuters daily in the long term. It will be the fourth MRT line to be operated by SMRT, after the North South line, East West line and the Circle line and also the fourth to be completely automated and driverless. This line is coloured brown on the rail map.


The fully underground line is 43 km (27 mi) long and consists of 31 stations, and will be among the world's longest driverless rapid transit lines. It will run through a combined north-south and east-west corridor, starting in the north at Woodlands town, then passing through the towns of Ang Mo Kio and Bishan, after that heading south to the residential estates of Thomson and Stevens, the shopping districts of Orchard Road and Marina Bay, then running eastwards along the east coast through Kallang, Marine Parade and Bedok South, before ending at Upper East Coast. Its depots are located at Mandai, south of Woodlands, and near the south-eastern terminus of the line at Tanah Merah.[3] By 31 December 2024, the planned Rapid Transit System (RTS) Link will interchange the line's Woodlands North terminus, allowing it to extend to Malaysia.[4] The Land Transport Authority announced on 11 August 2017 that the line will be the new line to accept only cashless payments after the existing lines were converted by 12 December 2018.[5]




Contents






  • 1 History


    • 1.1 Thomson stretch


    • 1.2 East Coast stretch


    • 1.3 Merger


    • 1.4 Possible extension




  • 2 Stations


  • 3 Train control


  • 4 External links


  • 5 References





History



Location of Thomson–East Coast MRT line



Thomson stretch


The Thomson Line was first announced on 25 January 2008. Several architectural and engineering consultancy packages were released in 2010 which indicated an increase in the number of stations from 18 in the initial announcement to the current 22 and length of the line from 27 to 30 km (17 to 19 mi).[6]


On 16 June 2011, the Land Transport Authority announced the location of the depot for the line, due to begin construction at the end of 2012. It also announced Woodlands as an interchange with the existing North South line and an additional station located near to Republic Polytechnic. In addition, the northern terminus will also house the Johor Bahru RTS link.[7]


On 29 August 2012, it was announced the Thomson Line will be ready from 2019 onwards instead of the indicative timeline of 2018 announced in the Land Transport Masterplan.[8]


Construction of the Thomson Line began in January 2014.[9]


On 27 June 2014, the groundbreaking ceremony took place at Woodlands. All the working station names were confirmed as the final names except for Sin Ming station which was changed to Bright Hill.



East Coast stretch


The Eastern Region Line was first officially announced on 18 October 2001. In its preliminary plans, Eastern Region Line was to have been a 40 kilometre rectangular loop that would complement the existing East West line and enhance inter- and intra-town travelling in the eastern region. It would have looped around the Jalan Besar and East Coast areas, intersecting the Circle line and other lines along the way, benefiting residents in Tampines, Bedok, Marine Parade, MacPherson and Kaki Bukit.[10] However, the northern part of the loop which includes Jalan Besar, Tampines, MacPherson, Bedok North and Kaki Bukit is now part of the Downtown Line Stage 3. The ERL is now planned to closely follow the southern stretch of the originally announced plan.


On 11 July 2012, a speech by Mrs Josephine Teo, Minister of State, Ministry of Finance and Ministry of Transport, at Downtown Line 3 (DTL3) Tunelling Works Ceremony, announced that the Land Transport Authority (LTA) are starting architectural and engineering consultancy studies for the Eastern Region Line, which will eventually connect to the Thomson line.[11]


On 29 May 2013, Land Transport Authority director of rail services, Melvyn Thong said at the Modern Railways conference, there are plans to extend ERL and link to the future Singapore Changi Airport's Terminal 4 which is set to be ready by 2017[12] but on 1 June 2013, LTA clarified that ERL will not provide an MRT link to the planned Terminal 4,[13] but instead, on 30 August 2013, Minister of State for Transport Josephine Teo unveiled plans that it will be linked to the future planned Singapore Changi Airport's Terminal 5, a mega terminal, which will be the largest terminal in Singapore upon completion around the mid 2020s.[14]



Merger


On 15 August 2014, it was announced that the Eastern Region line would be merged with the Thomson line to form the Thomson–East Coast line, extending the project to five stages,[2] with nine more stations. This is more than the number of stations originally planned on the line.


On 21 July 2016, the groundbreaking ceremony for the East Coast stretch took place at Marine Parade. All the working station names, including Xilin on the Downtown Line extension, were confirmed as the final names except for Amber station which was changed to Tanjong Katong. The authorities are also considering extending the TEL to all terminals at Changi Airport, including the upcoming Terminals 4 and 5, announced Transport Minister Khaw Boon Wan.[15][16]


On 15 September 2017, SMRT Trains was appointed as the operator of the line.[17]



Possible extension


On 20 January 2017, it was announced that studies are ongoing for the possibility of extending the TEL from Sungei Bedok to serve the future Changi Airport Terminal 5, further extending to Changi Airport Terminal 1, 2 and 3, and to Changi Village. This way, commuters in the future can travel to any of the terminals in Changi Airport seamlessly without having to change two lines at Sungei Bedok and Expo .[18]



Stations


.mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-spacing:0;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output .RMir{border:0;border-spacing:0;display:table;line-height:0;padding:0!important;margin:0 auto!important}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>tbody>tr{display:inline-table}.mw-parser-output .RMir>tbody>tr>td{padding:0;height:20px;min-height:20px}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMic{position:absolute;left:0px;top:0px;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir div>.RMtx{position:absolute}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}






Thomson-East Coast MRT Line


Legend





























































































































































































































































































































































































































































































































































































Left arrow Bukit Chagar







































 TE1  RTS 


Woodlands North



































Left arrow  Jurong East – Marina South Pier Right arrow














 TE2  NS9 


Woodlands











 TE3 


Woodlands South











 TE4 


Springleaf











 TE5 


Lentor











 TE6 


Mayflower











 TE7 


Bright Hill











 TE8 


Upper Thomson



















  Dhoby Ghaut Right arrow

















 TE9  CC17 


Caldecott














Left arrow  HarbourFront











 TE10 


Mount Pleasant





















Left arrow  Bukit Panjang – Sungei Bedok Right arrow














 TE11  DT10 


Stevens











 TE12 


Napier











 TE13 


Orchard Boulevard





















Jurong East Right arrow


















 TE14  NS22 


Orchard















Marina South Pier Right arrow












 TE15 


Great World











 TE16 


Havelock























Left arrow  Tuas Link




















 TE17  EW16  NE3 


Outram Park


















Left arrow  HarbourFront – Punggol Right arrow

















Left arrow  Pasir Ris











 TE18 


Maxwell











 TE19 


Shenton Way





















Left arrow  Marina South Pier – Jurong East Right arrow















Left arrow  HarbourFront – Stadium Right arrow














 TE20  NS27  CE2 


Marina Bay











 TE21 


Marina South











 TE22 


Gardens by the Bay











 TE22A 


Founders' Memorial











 TE23 


Tanjong Rhu











 TE24 


Katong Park











 TE25 


Tanjong Katong











 TE26 


Marine Parade











 TE27 


Marine Terrace











 TE28 


Siglap











 TE29 


Bayshore











 TE30 


Bedok South























 TE31  DT37 


Sungei Bedok















  Bukit Panjang Right arrow

























































































































































































Station Number

Station Name

Interchange/Notes
Stage 1 (under construction, to be ready by 2019)

 TE1  RTS 
Woodlands North Interchange with the Johor Bahru–Singapore Rapid Transit System

 TE2  NS9 
Woodlands Interchange with the North South Line
 TE3  Woodlands South
Stage 2 (under construction, to be ready by 2020)
 TE4  Springleaf
 TE5  Lentor
 TE6  Mayflower
 TE7  Bright Hill
 TE8  Upper Thomson

 TE9  CC17 
Caldecott Interchange with the Circle Line
Stage 3 (under construction, to be ready by 2021)
 TE10  Mount Pleasant

 TE11  DT10 
Stevens Interchange with the Downtown Line
 TE12  Napier
 TE13  Orchard Boulevard

 TE14  NS22 
Orchard Interchange with the North South Line
 TE15  Great World
 TE16  Havelock

 TE17  EW16  NE3 
Outram Park Interchange with the East West Line and the North East Line
 TE18  Maxwell
 TE19  Shenton Way

 TE20  NS27  CE2 
Marina Bay Interchange with the North South Line and the Circle Line extension
 TE21  Marina South
 TE22  Gardens by the Bay
Infill station (under construction, to be ready by 2025)
 TE22A 
Founders' Memorial[19]

Stage 4 (under construction, to be ready by 2023)
 TE23  Tanjong Rhu
 TE24  Katong Park
 TE25  Tanjong Katong
 TE26  Marine Parade
 TE27  Marine Terrace
 TE28  Siglap
 TE29  Bayshore
Stage 5 (under construction, to be ready by 2024)
 TE30  Bedok South

 TE31  DT37 
Sungei Bedok Interchange with the Downtown Line


Train control


The Thomson–East Coast line is equipped with Alstom Urbalis 400 Communications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[20][21] The subsystems consist of Automatic train protection (ATP) to govern train speed, Iconis Automatic Train Supervision (ATS) to track and schedule trains and Smartlock Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.


Alstom will also be supplying platform screen doors for the Thomson–East Coast line.[21]



External links


  • Thomson–East Coast Line


References





  1. ^ http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=f0b205a6-69ab-49b0-b94d-65384ee5e5c0


  2. ^ ab "Joint News Release by the Land Transport Authority & Singapore Land Authority – Thomson–East Coast Line: New MRT Links In The East". Land Transport Authority. 15 August 2014. Archived from the original on 19 August 2014..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output q{quotes:"""""""'""'"}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-limited a,.mw-parser-output .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  3. ^ "LTA unveils sites for Thomson Line terminal station". Channel News Asia. Retrieved 2011-06-17.


  4. ^ http://www.straitstimes.com/singapore/transport/singapore-to-johor-baru-mrt-service-to-start-by-end-2024


  5. ^ "Singapore aims for fully cashless transport system by 2020: LTA". Channel NewsAsia. Retrieved 2017-08-14.


  6. ^ http://img706.imageshack.us/img706/2343/tslinfo.png


  7. ^ "Thomson Line Depot To Be Constructed In Mandai". Land Transport Authority. Archived from the original on 7 August 2011. Retrieved 16 June 2011.


  8. ^ "Speech by Mr Lui Tuck Yew, Minister for Transport, at the Inspection of Downtown Line 1 Station and Announcement of Thomson Line alignment, 29 August 2012, 10.00am at Telok Ayer Station". Ministry of Transport. 29 August 2012. Archived from the original on 8 September 2012. Retrieved 29 August 2012.


  9. ^ "Caldecott – It's Beginning". Thomson Line Construction. Retrieved 16 January 2014.


  10. ^ "Speech by Mr Raymond Lim – Doubling our Rail Network". Ministry of Information, Communications and the Arts. Retrieved 2008-01-26.
    [permanent dead link]



  11. ^ "Speech by Mrs Josephine Teo, Minister of State, Ministry of Finance and Ministry of Transport, at DTL3 Tunelling Works Ceremony". Ministry Of Transport. Retrieved 11 July 2012.
    [permanent dead link]



  12. ^ "Direct MRT link to Changi Airport planned". The Straits Times. 2013-05-30.


  13. ^ "No Terminal 4 link on Eastern Region Line". asiaone. 2013-06-01. Retrieved 2013-06-04.


  14. ^ "Changi T5 to land by mid 2020s, capacity to handle 50m passenger movements a year". The Straits Times. Retrieved 30 August 2013.


  15. ^ "Names of MRT stations on Thomson–East Coast Line (East Coast stretch) announced". Today Online. 21 July 2016.


  16. ^ Valerie Koh (21 July 2016). "Upcoming Thomson–East Coast Line may link to all terminals at Changi Airport". Today Online.


  17. ^ "SMRT Trains Appointed to Operate the Thomson–East Coast Line". Land Transport Authority. 15 September 2017.


  18. ^ "The Rail Report: Higher Reliability and Expanded Network in 2017 | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 2017-01-20.


  19. ^ Tan, Christopher (7 January 2019). "Thomson-East Coast line to have station at Founders' Memorial in Marina Bay". The Straits Times. Retrieved January 7, 2019.


  20. ^ "GE Transportation Chosen by Singapore's Land Transport Authority (LTA) To Supply the Signaling of New Thomson and Eastern Region Lines". Archived from the original on 11 March 2017. Retrieved 20 October 2017.


  21. ^ ab "Singapore's LTA selects GE Transportation for driverless CBTC solution". Railway Technology. 7 May 2014. Retrieved 6 March 2016.
















Comments

Popular posts from this blog

Information security

Volkswagen Group MQB platform

Daniel Guggenheim